Reconstruction design procedure regarding local Highway ‘Surgut –Salekhard’ is being conducted within area of Novy Urengoy near Nida Railway Station as follows:
- Significant widening of two-way road up to four-way path (length of the above road is about 11 km) from Novy Urengoy up to the exit of local airport including reconstruction of artificial structures of Nida Railway Station;
- Reconstruction of existing structures with two flyovers installation per two traffic lanes on each side one over the Sverdlovskaya Railroad including railway grade crossing elimination.
TECHNICAL FEATURES (761 - 768km)
- steel deck with orthotropic slab
- deck is being arranged per two-way traffic
- lanes quantity – 4 pcs
- carriageway clearance –5 m
- height of the structure – 7.5 m
TECHNICAL FEATURES (761km)
- schema of continuous deck section: (40.5+3x42)+(42+4x63+48+60+48+38.5 m
- schema of continuous deck section: – 670 m
- pedestrian lane width – 2x1.5 m
TECHNICAL FEATURES (768km)
- schema of continuous deck section: 42+66+96+87+87+61 m
- schema of continuous deck section: – 450 m
- width of service approaches – 2x0.75 m