Our reconstruction design procedure regarding local Highway ‘Surgut – Salekhard is being conceived as a significant widening of two-way road up to four-way path conducted within the section of Korotchaevo – Novy-Urengoy (the section is about 80 km long). The entire artificial structural elements are being reconstructed (disassembling of two–way carriageway and arrangement of four lanes highway). Old railway crossing is being entirely demolished, as a part of the project, with relocation of transportation toward the four-way viaduct over the Sverdlovskaya Railroad.
TECHNICAL FEATURES
- two-way road
- steel deck with orthotropic slab
- schema of continuous part of the left direction: 42+63+75+72+63+45 m
- schema of continuous part of the right direction: 27+45+57+42+42+66+42+42 m
- bridge length from abutments — 375 m
- carriageway width: — 10.5 m
- pedestrian lane width — 1.5 m
- lanes quantity – 2 pcs
- height of the structure — 7.5 m