Bridge over the Severni Donets river, Kamensk-Shachtinski

Rostovskaya oblast

2019-2023

Motorway road Don M-4 Moscow – Woronesch - Rostow-Na-Donu - Noworossijsk. Bridge reconstruction over the Severni Donets River on 930+788 km of M-4‘Don’ started from Moscow to Woronesch up to Rostow-Na-Donu, Rostovskaya Oblast.

The above truss bridge of 55.03+3×87.9+55.03 m was completed about 1960. Back in 2019 the damage of upper girth within span 4-5 was spotted by the company ‘SMU-Dordonstroy’. Further the bridge was closed for transportation and pedestrians.

TECHNICAL FEATURES

  • bridge schema: 61.0+3х88+61.0 m;
  • bridge length from abutments edge: 397.62 m;
  • clear headway of bridge: - 15.25 m;
  • width of pedestrian lane upstream: 2.25 m;
  • bridge schema: 61.0+3х88+61.0 m;
  • bridge length from abutments edge: 397.62 m;
  • clear headway of bridge: - 15.25 m;
  • width of pedestrian lane upstream: 2.25 m;
  • technical approach of downstream: 0.75 m;
  • quantity of lanes: 3 pcs.;
  • bridge clearance per main span: 12х80 m.
  • bridge schema: 61.0+3х88+61.0 m;
  • bridge length from abutments edge: 397.62 m;
  • clear headway of bridge: - 15.25 m;
  • width of pedestrian lane upstream: 2.25 m;
  • technical approach of downstream: 0.75 m;
  • quantity of lanes: 3 pcs.;
  • bridge clearance per main span: 12х80 m.

SCOPE OF WORK

Stage DD:

  • bridge schema: 61.0+3х88+61.0 m;
  • bridge length from abutments edge: 397.62 m;
  • clear headway of bridge: - 15.25 m;
  • width of pedestrian lane upstream: 2.25 m;
  • technical approach of downstream: 0.75 m;
  • quantity of lanes: 3 pcs.;
  • bridge clearance per main span: 12х80 m.

Client:
SC “DIM”

Federal client:
State Company AVTODOR

Design Stage:
2019 – 2020

Construction Stage:
2021  – 2023