pp-Nagatinskiy-zaton-1
< Projects

Pedestrian crossing over Nagatinsky Zaton

Moscow

2022-2024

Our pedestrian bridge is located within the Southern Administrative District of Moscow, between the historical waterway bed and that modern part of the Moscow River which is suitable for navigation nowadays.

Bridge structure crosses the area of ​​the being designed ‘Nagatinsky Zaton Transportation Hub’ in close proximity to the metro station exit being under construction on the East Side of Nagatinsky Bay and the residential buildings under construction on Korabelnaya Street, which is reckoned as a part of the construction Stage-II of the ‘River Park Residential Complex’ on the West Side.

The bridge crossing over the Nagatinsky Bay connects Korabelnaya Street from the Western bank with Kolomenskaya Street from the Eastern bank and provides 2.0 meters per bicycle passage plus 4.5 meters for pedestrians including handicaps.  Recreation areas are available as well.Original structural system is a ‘Fink Truss’, where the top girder is supported via vertical masts, which themselves are suspended by stressed rods. Absence of a continuous lower chord is the feature of the Fink Truss design, i.e. mast heads are always connected to adjacent mast legs and vice versa.Design of Nagatinsky Pedestrian Crossing is being conceived as an inverted Fink Truss. In addition, the redundant diagonals connecting the second and subsequent masts are omitted.

TECHNICAL FEATURES

  • bridge schema: 58+99+58m
  • length of the bridge — 218.95m
  • width of pedestrian lane — 4.5m
  • bridge schema: 58+99+58m
  • length of the bridge — 218.95m
  • width of pedestrian lane — 4.5m
  • bicycle lane– 2m
  • bridge clearance — 10х4.5m
  • bicycle lane– 2m
  • bridge clearance — 10х4.5m

SCOPE OF WORK

Stage DD:

  • the entire cycle of engineering survey
  • hydrological calculation
  • air dynamic test
  • full range of design work on main structures with proper calculations
  • traffic management design
  • reconstruction of utilities
  • design of outdoor illumination with architectural lighting, power supply, water drainage and navigation lights installation
  • design of structures included in the infrastructure of a linear facility
  • construction organization design
  • environment safety design
  • fire safety design
  • structural monitoring for the period of construction as well as per period of site service
  • maintenance design for the period of service
  • estimate documentation design

Client:
Moscow Federal Enterprise ‘Roads and Bridges Construction Department’

Design Stage:
2022 – 2023

Construction Stage:
2023  – 2024